喷嘴更换器通过协调序列运行。贴片头携带当前吸嘴移动到更换站。机械或气动机构将吸嘴释放到转盘或料仓的空槽中。然后贴片头对准所需吸嘴的槽位,拾取并牢固锁定。传感器验证正确就位和对准。整个更换周期根据配置需要0.5–2.0秒。系统使用气动压力(0.4–0.6 MPa)进行夹紧和释放,并使用电信号进行控制和监控。设计确保重复定位精度在±0.02–0.05毫米内,这对于可靠的元件处理至关重要。
| 参数 | 典型区间 | 选型说明与越界后果 |
|---|---|---|
| 吸嘴容量 | 8–64 位置 | Number of nozzles that can be stored and exchanged. |
| 吸嘴更换时间 | 0.5–2.0 s | Time to complete one nozzle change cycle. |
| 定位重复精度 | ±0.02–±0.05 mm | Repeatability of nozzle placement in the changer. |
| 工作压力 | 0.4–0.6 MPa | Pneumatic pressure for nozzle clamping and release. |
| 电源电压 | 24 ±10% V DC | DC power for sensors and actuators. |
| 功耗 | 10–30 W | Typical power draw during operation. |
| 工作温度 | 10–40 °C | Ambient temperature range for reliable operation. |
| 存储温度 | -20–60 °C | Temperature range for non-operational storage. |
| 相对湿度 | 30–80 % RH | Non-condensing humidity range. |
| 防护等级 | IP40–IP54 | Protection against dust and water splashes.IEC 60529 |
| 主体材料 | Aluminum 6061 | Lightweight and corrosion-resistant alloy.ASTM B221 |
| 重量 | 2.5–8.0 kg | Depends on nozzle capacity and configuration. |
| 外形尺寸(长×宽×高) | 200×150×120–400×300×250 mm | Overall dimensions of the changer unit. |
区间为行业参考值,供询价时圈定范围用,不构成供应商承诺。下单前请向法人制造商核实每一项数值与标准。
诱因 → 失效模式 → 工程缓解
| pressure: | 400至600毫巴(真空压力范围) |
| other spec: | 吸嘴更换时间:2-5秒,位置重复精度:±0.01毫米,最大元件重量:50克 |
| temperature: | 15°C至35°C(工作环境温度) |
不是客户评论,也不是实时热度。以下维度用于前期 RFQ 准备和供应商评估。
这些分值是采购评估维度示例,不代表真实客户评分、具体国家买家反馈或实时询盘。
吸嘴容量范围为8至64个位置,具体取决于型号和配置。确切数量应与制造商确认具体单元。
更换时间通常为每次循环0.5至2.0秒。这可能因更换器设计和具体吸嘴而异。
工作压力为0.4–0.6 MPa,电源电压为24 V DC ±10%。这些是参考值,请与制造商确认您的应用。
它可在环境温度10–40 °C、相对湿度30–80%无冷凝的条件下运行。存储温度为-20–60 °C。防护等级为IP40–IP54(IEC 60529)。
CNFX 是开放目录,不是交易平台或采购代理。工厂资料和表单用于帮助你准备直接沟通。
CNFX 制造商资料、技术分类、公开产品信息和持续合理性检查。
说明目标数量、应用场景、交期和关键技术要求,用于准备 RFQ 或供应商评估。